ERCOT

The Electric Reliability Council of Texas operates the electric grid and manages the deregulated market for 75 percent of the state.

Public Information

ERCOT has public information to aid in the operation of their energy market.

Resource Nodes, Load Zones, and Trading Hubs

Resource Node to Resource Name List (CIM 3.2)

SETTLEMENTPOINTTYPE RESOURCENODE RESOURCENAME
Combined Cycle Train Logical Resource Node AMOCOOIL_CC1 AMOCOOIL_CC1
Combined Cycle Train Logical Resource Node AMOCOOIL_CC2 AMOCOOIL_CC2
Combined Cycle Train Logical Resource Node BASTEN_CC1 BASTEN_CC1
Combined Cycle Train Logical Resource Node BOSQUESW_CC1 BOSQUESW_CC1

Electric Bus to Hub List

Files

  • Electrical_BusMap_To_HUB

    ELECTRICAL_BUS HUB_BUS_NAME HUB
    ADICKS_345C ADK HB_HOUSTON
    ADICKS__345A ADK HB_HOUSTON
    CBY_5025 CBY HB_HOUSTON
    CBY_5060 CBY HB_HOUSTON
  • Full_Electrical_Bus

    ELECTRICAL_BUS
    1
    0001DUPV1_
    0001HWFG1
    0001VICTOR

Settlement Points List and Electrical Buses Mapping

Files

  • CCP_Resource_names

    CCP_NAME LOGICALREOURCENODENAME
    AMOCOOIL_CC1 AMOCOOIL_CC1
    AMOCOOIL_CC2 AMOCOOIL_CC2
    BASTEN_CC1 BASTEN_CC1
    BOSQUESW_CC1 BOSQUESW_CC1
  • Hub_Name_AND_DC_Ties

  • NOIE_Mapping

    PHYSICAL_LOAD NOIE VOLTAGE_NAME SUBSTATION ELECTRICAL_BUS
    AMD_T1X LZ_AEN 138 ADVANCE AMDX
    AMD_T1Y LZ_AEN 138 ADVANCE AMDY
    AG_123 LZ_AEN 138 ANGUS ANGUSVAL
    AG_456 LZ_AEN 138 ANGUS ANGUSVALZ
  • Resource_Node_to_Unit

    RESOURCE_NODE UNIT_SUBSTATION UNIT_NAME
    AEEC AEEC ANTLP_1
    AEEC AEEC ANTLP_2
    AEEC AEEC ANTLP_3
    AEEC AEEC ELK_1
  • Settlement_Points

    ELECTRICAL_BUS NODE_NAME PSSE_BUS_NAME VOLTAGE_LEVEL SUBSTATION SETTLEMENT_LOAD_ZONE RESOURCE_NODE HUB_BUS_NAME HUB PSSE_BUS_NUMBER
    1 1 L_BUCKRA8_1Y 138 BUBORA LZ_SOUTH 7103
    0001DUPV1_ 1 DUP_DUPV1_G1 13.8 DUPV1 LZ_SOUTH 110681
    0001HWFG1 1 HWF_HWFG1 34.5 HWF LZ_WEST 150611
    0001VICTOR 1 VIC_VICTORG6 18 VICTORIA LZ_SOUTH 110882

Load Data

Load Distribution Factors

ERCOT publishes load distribution factors to use in their Congestion Revenue Right (CRR) and Day Ahead Market (DAM).

LdfDate LdfHour SubStation DistributionFactor LoadID MVARDistributionFactor MRIDLoad DSTFlag
09/12/2018 01:00 MILLICAN 0 70 0.3509999812 {D71F619B-5FEB-4D44-B7FC-27097FD8001F} N
09/12/2018 01:00 STEELE_S 2 80 4.1593375206 {AB14B651-6C11-4BDB-9C7A-AAFAF380D614} N
09/12/2018 01:00 LIL 4.2 0LIL_12 0.8296427131 {958F304A-1839-493A-AC06-AF787D00C9E7} N
09/12/2018 01:00 SIGMOR 8.1 1 -2.0873954296 {02C125AC-ED82-4EFA-857C-D2DAC9AA86F8} N

Load Profiles

Load Profiling, within the ERCOT market, is the practice of estimating 15-minute interval Load for Customers where interval consumption is not available. The purpose of the Electric Reliability Council of Texas (ERCOT) Load Profiling Guide (LPG) is to explicate the language and intent in the Protocols that affect Load Profiling. It is not a substitute for the ERCOT Protocols or the Public Utility Commission of Texas (PUCT) Substantive Rules. In the event of a conflict of Protocols or PUCT Substantive Rules, the Protocols and PUCT Substantive Rules take precedence over the LPG.

Weather Data

Weather Assumptions

DeliveryDate HourEnding Coast East FarWest North NorthCentral SouthCentral Southern West DSTFlag
09/17/2018 01:00 80.1 77.5 71.5 77 80 73 79.2 71.2 N
09/17/2018 02:00 79.6 76.5 70.5 74.5 79 72.5 78.6 70.2 N
09/17/2018 03:00 78.1 76 70 75 77.75 71.5 78.2 69.2 N
09/17/2018 04:00 78.1 76 69 75.5 77 71 78.4 69 N

Generators

Capacity Demand and Reserves Report May 2018

Data

UNIT NAME GENERATION INTERCONNECTION PROJECT CODE UNIT CODE COUNTY FUEL ZONE IN SERVICE 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Operational Resources (Thermal)
4 COMANCHE PEAK U1 CPSES_UNIT1 SOMERVELL NUCLEAR NORTH 1990 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0 1,235.0
5 COMANCHE PEAK U2 CPSES_UNIT2 SOMERVELL NUCLEAR NORTH 1993 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0 1,225.0
6 SOUTH TEXAS U1 STP_STP_G1 MATAGORDA NUCLEAR COASTAL 1988 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0
7 SOUTH TEXAS U2 STP_STP_G2 MATAGORDA NUCLEAR COASTAL 1989 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0 1,340.0
8 COLETO CREEK COLETO_COLETOG1 GOLIAD COAL SOUTH 1980 655.0 655.0 655.0 655.0 655.0 655.0 655.0 655.0 655.0 655.0 655.0

Renewables - Wind

Wind Power Production - Hourly Averaged Actual and Forecasted Values

DELIVERY_DATE HOUR_ENDING ACTUAL_SYSTEM_WIDE COP_HSL_SYSTEM_WIDE STWPF_SYSTEM_WIDE WGRPP_SYSTEM_WIDE ACTUAL_LZ_SOUTH_HOUSTON COP_HSL_LZ_SOUTH_HOUSTON STWPF_LZ_SOUTH_HOUSTON WGRPP_LZ_SOUTH_HOUSTON ACTUAL_LZ_WEST COP_HSL_LZ_WEST STWPF_LZ_WEST WGRPP_LZ_WEST ACTUAL_LZ_NORTH COP_HSL_LZ_NORTH STWPF_LZ_NORTH WGRPP_LZ_NORTH DSTFlag
09/18/2018 11 5250.27 4682.4 4290.3 2822 635.21 660.2 557.8 309.5 4513.37 3886.3 3620.9 2478.6 101.69 135.9 111.6 33.9 N
09/18/2018 12 5382.19 4877.6 5187.3 3691.2 615.6 631.6 661.6 401.2 4659.07 4134 4428.6 3274.9 107.52 112 97.1 15.1 N
09/18/2018 13 5834.02 5150.8 5220.4 3719.1 608.82 658.4 665.9 382.1 5072.59 4387.5 4449.6 3315.4 152.61 104.9 104.9 21.6 N
09/18/2018 14 6272.57 5620.4 5829.9 4292.4 604.56 719 697.6 395.2 5511.48 4788.7 4985.9 3839.4 156.53 112.7 146.4 57.8 N

ERCOT Wind Patterns for Existing Sites, 1980-2017

A lot of information is located at Grid Information - Resource Adequacy http://www.ercot.com/gridinfo/resource

Files

  • Existing Wind Site ID Key.xlsx
AWST SITE NAME AWST SITE ID # FINAL MW ERCOT Unit Name(s) ERCOT Unit Name(s)
ANACACHO_ANA 1 99.825 ANACACHO WIND
ASTRA_UNIT1 2 163.2 FALVEZ ASTRA WIND
BAFFIN_UNIT1 3 202 BAFFIN WIND UNIT1 BAFFIN WIND UNIT2
BBREEZE 4 228 BRUENNING'S BREEZE
  • ERCOT_existing_1980-2017_20180625.CSV

    Historical generation details for wind fleet

YYYYMMDD HHMM_CST SITE_00001:capacity=99.8 SITE_00002:capacity=163.2 SITE_00003:capacity=202 SITE_00004:capacity=228 SITE_00005:capacity=150 SITE_00007:capacity=19.7 SITE_00008:capacity=230 SITE_00010:capacity=99 SITE_00011:capacity=61 SITE_00012:capacity=149.8 SITE_00013:capacity=120 SITE_00015:capacity=120.6 SITE_00016:capacity=232.5 SITE_00017:capacity=170.2 SITE_00018:capacity=180 SITE_00019:capacity=114 SITE_00020:capacity=165 SITE_00021:capacity=214.5 SITE_00022:capacity=149.5 SITE_00023:capacity=298.5 SITE_00024:capacity=150 SITE_00025:capacity=148.3 SITE_00026:capacity=126.5 SITE_00027:capacity=50.4 SITE_00028:capacity=151.2 SITE_00029:capacity=200.1 SITE_00030:capacity=130.5 SITE_00031:capacity=120 SITE_00032:capacity=253 SITE_00033:capacity=230 SITE_00034:capacity=121.9 SITE_00035:capacity=63 SITE_00036:capacity=78 SITE_00037:capacity=92.3 SITE_00038:capacity=121.9 SITE_00039:capacity=27.4 SITE_00040:capacity=60 SITE_00041:capacity=155.4 SITE_00042:capacity=200 SITE_00043:capacity=69.6 SITE_00044:capacity=80 SITE_00045:capacity=150 SITE_00046:capacity=200.5 SITE_00047:capacity=211.2 SITE_00048:capacity=119.9 SITE_00050:capacity=213 SITE_00051:capacity=299 SITE_00052:capacity=223.5 SITE_00053:capacity=300 SITE_00054:capacity=230 SITE_00055:capacity=299.7 SITE_00056:capacity=99.9 SITE_00057:capacity=100 SITE_00058:capacity=165.6 SITE_00059:capacity=197 SITE_00060:capacity=170.2 SITE_00061:capacity=110 SITE_00062:capacity=150 SITE_00063:capacity=145 SITE_00064:capacity=79.3 SITE_00065:capacity=158.6 SITE_00066:capacity=40.3 SITE_00067:capacity=155 SITE_00068:capacity=210.1 SITE_00069:capacity=200 SITE_00071:capacity=200 SITE_00072:capacity=100.5 SITE_00073:capacity=49.5 SITE_00074:capacity=200.1 SITE_00075:capacity=201.6 SITE_00076:capacity=200 SITE_00077:capacity=200 SITE_00078:capacity=110 SITE_00079:capacity=230.4 SITE_00080:capacity=124.2 SITE_00081:capacity=90 SITE_00082:capacity=211.2 SITE_00083:capacity=288.6 SITE_00084:capacity=150 SITE_00085:capacity=100 SITE_00086:capacity=30 SITE_00087:capacity=150 SITE_00088:capacity=196.6 SITE_00090:capacity=60 SITE_00091:capacity=58.8 SITE_00092:capacity=82.5 SITE_00093:capacity=179.8 SITE_00094:capacity=142.5 SITE_00095:capacity=115.5 SITE_00096:capacity=199.5 SITE_00097:capacity=403.2 SITE_00099:capacity=218.3 SITE_00100:capacity=190.8 SITE_00101:capacity=249 SITE_00102:capacity=84 SITE_00103:capacity=203.3 SITE_00104:capacity=150 SITE_00106:capacity=160 SITE_00107:capacity=174 SITE_00108:capacity=250 SITE_00109:capacity=95.4 SITE_00110:capacity=249 SITE_00111:capacity=150 SITE_00114:capacity=204.1 SITE_00115:capacity=200 SITE_00116:capacity=300.3 SITE_00117:capacity=164.7 SITE_00118:capacity=211.2 SITE_00119:capacity=194 SITE_00120:capacity=160.9 SITE_00121:capacity=101.2 SITE_00122:capacity=80.2 SITE_00123:capacity=120 SITE_00124:capacity=98.8 SITE_00125:capacity=135 SITE_00126:capacity=135 SITE_00127:capacity=105.8 SITE_00128:capacity=80.5 SITE_00129:capacity=37.5 SITE_00130:capacity=283.2 SITE_00131:capacity=209 SITE_00132:capacity=150 SITE_00133:capacity=225 SITE_00134:capacity=169.5 SITE_00135:capacity=125.6 SITE_00136:capacity=150 SITE_00137:capacity=257.3 SITE_00138:capacity=59.8 SITE_00139:capacity=112.5 SITE_00140:capacity=67.6 SITE_00141:capacity=77.2 SITE_00142:capacity=82.5 SITE_02006:capacity=135.4 SITE_02009:capacity=200 SITE_02014:capacity=100.6 SITE_02049:capacity=148.6 SITE_02070:capacity=200 SITE_02089:capacity=92.6 SITE_02105:capacity=207.2 SITE_02112:capacity=34.3
19800101 0 0 30.5 0 0 0 0 0 11.3 7.4 72.9 0 5.3 7.8 6.8 18.4 10 0 15.5 0 10.3 0 0 8 19.2 57.6 0 13.7 10.8 42.2 0 8.1 5.9 0 0 0 0 0 26.1 0 8.1 6.9 0.6 33.2 19.4 35.5 13.7 13.3 7 0.3 26.6 33.8 13.7 15.2 0 19.1 0 0.6 0 3.6 0.2 0.8 0 10 0 178 0 6.1 4.9 0 0 0 0 0 65.9 7.8 6.4 55.5 78.2 0 0 2.4 33 6.4 0 2.7 0 0 5 6.9 8.7 0 84.6 61.4 23.1 16.3 0 25.3 0 19.4 33.3 0 0 1.4 0 89 112.8 61.5 54.1 43.2 31.1 8.1 0 7.8 8.4 5.2 5.2 5.4 5.7 2.8 0 9 17.2 0 5.6 5.8 4.6 98.3 22.3 0 0 4.3 3.1 11.5 0 0 0 0 3.4 2.9 1.2
19800101 100 0 33.3 0 0 0 0 0 26.1 9.5 60.8 0 6.8 15.7 9.3 30.7 11.9 0 13.3 7.1 11 0 0.1 13.3 19.4 67.7 0 33.2 25.8 83.4 8.8 9.4 10 0 0 0 0 0 44.9 0 8.2 6.9 9.9 37.3 21.3 40 17.3 18.3 12.1 0 27 36 12.7 13.3 8.1 44.2 0 0 6.9 6.8 0.4 0 0 1.2 0 177.9 7.1 5.7 6.1 0 0 0.6 3.5 0 32.2 7 8 68.4 77.4 0 0 4.5 53.2 16.9 0 4.5 0 0 4.5 6.8 5.3 0 112.6 100 50.9 24.9 0 39.8 0 14.3 37.4 0 0 3.9 0 117.5 145 56.2 64.5 73.6 47.4 12.2 0 11 9.5 7.3 9.3 6.2 4.2 7.3 0 18.8 36 0 9 6.6 7.8 130.2 29.9 0 3 6.5 6.2 14.6 0 0 0 6.5 3 10.4 1.9
19800101 200 0 29.1 0 0 8.9 0 0 30.8 9.2 69.2 0 12.9 25.3 14.2 26.6 18 0 24.3 6 12.5 0 4.9 10.6 22.6 74.5 0.8 38.3 31.3 110.2 14.2 21.4 13.4 0 0 0 0.9 0 64.5 0 11.5 9.7 11.5 45.2 23.7 39.6 22.3 26.9 16.2 0 26.8 23.9 10.3 12.2 10.4 36.6 0 4 21.6 3.9 0.4 0.4 0 8 1.1 176 14.3 5.2 4.3 0 0 0.6 4.9 0 23.8 12.6 7.3 63.2 100.9 0 0 11.7 62.1 27.1 2.2 7.4 2.1 2.5 14.1 14.6 17.2 0 100.5 94.2 47.2 26.1 0 21.4 0 5.1 36.3 0 0 6.4 8.6 126 143.3 37.6 49 84.4 61 21.9 0 13.6 11.2 8 10.2 7.1 4.9 5.7 0 13.4 55 20.7 9.1 7 8.3 135 32 0 7.6 6.2 3.6 18.7 0 0 0 13.9 3.6 21.6 5.7
  • ERCOT_2018_WindGenProfiles_1980-2017_IssueB_PUBLIC.pdf

    Description of modeling efforts

Renewables - Solar

ERCOT SolarProfiles 1997-2015 CentralStation Future 20161106

Day-Ahead Market

Real-Time Market

Prices

This will be useful for validation and model tuning.

Transmission

SCED Shadow Prices and Binding Transmission Constraints

SCEDTimeStamp RepeatedHourFlag ConstraintID ConstraintName ContingencyName ShadowPrice MaxShadowPrice Limit Value ViolatedMW FromStation ToStation FromStationkV ToStationkV CCTStatus
09/20/2018 12:55:12 N 4 PNHNDL BASE CASE 0 9251 3459.9 3124 -335.9 0 0 NONCOMP
09/20/2018 12:55:12 N 1 6270__C DEMSSAG8 0 3500 226.4 218.2 -8.2 WGROB BLMND 138 138 NONCOMP
09/20/2018 12:55:12 N 7 654T654_1 DFERGRM8 30.14179 3500 241.9 241.9 0 WIRTZ STARCK 138 138 NONCOMP
09/20/2018 12:55:12 N 5 LINTER_SOLSTI1_1 SNORODE5 0 3500 189.4 171.4 -18 LINTERNA SOLSTICE 138 138 NONCOMP
09/20/2018 12:55:12 N 3 6437__F DMTSCOS5 251.41368 3500 200.6 200.6 0 SCRCV KNAPP 138 138 COMP

Daily RUC Active and Binding Transmission Constraints

Data

DeliveryDate HourEnding RUCTimeStamp ConstraintID ConstraintName ContingencyName Limit Value ViolationAmount FromStation ToStation FromStationkV ToStationkV DSTFlag
09/20/2018 01:00 09/19/2018 14:30:33 1 HOLLY4_SOUTH_1_1 SCABWES8 211 211 0 HOLLY4 SOUTH_SI 138 138 N
09/20/2018 02:00 09/19/2018 14:30:33 2 HOLLY4_SOUTH_1_1 SCABWES8 211 211 0 HOLLY4 SOUTH_SI 138 138 N
09/20/2018 02:00 09/19/2018 14:30:33 3 HOLLY4_SOUTH_1_1 SALAN_28 211 211 0 HOLLY4 SOUTH_SI 138 138 N
09/20/2018 03:00 09/19/2018 14:30:33 4 HOLLY4_SOUTH_1_1 SCABWES8 211 211 0 HOLLY4 SOUTH_SI 138 138 N

Hourly RUC Active and Binding Transmission Constraints

Data

DeliveryDate HourEnding RUCTimeStamp ConstraintID ConstraintName ContingencyName Limit Value ViolationAmount FromStation ToStation FromStationkV ToStationkV DSTFlag
09/20/2018 15:00 09/20/2018 13:03:01 1 LINTER_SOLSTI1_1 SNORODE5 189 189 0 LINTERNA SOLSTICE 138 138 N
09/20/2018 15:00 09/20/2018 13:03:01 2 190T152_1 DFPPFAY5 223 223 0 GIDEON WINCHE 138 138 N
09/20/2018 15:00 09/20/2018 13:03:01 3 CRLNW_MR1H DRENCRL5 495 495 0 CRLNW CRLNW 345 1 N
09/20/2018 15:00 09/20/2018 13:03:01 4 DOWNIES_AX1H SDOWMOO8 50 50 0 DOWNIES DOWNIES 138 69 N

Weekly RUC Active and Binding Transmission Constraints

Data

DeliveryDate HourEnding RUCTimeStamp ConstraintID ConstraintName ContingencyName Limit Value ViolationAmount FromStation ToStation FromStationkV ToStationkV DSTFlag
09/21/2018 15:00 09/20/2018 01:09:18 1 BRNLAN86_A DCHBJOR5 478 478 0 LAN BRN 138 138 N
09/21/2018 15:00 09/20/2018 01:09:18 2 6437__F DMTSCOS5 214 214 0 SCRCV KNAPP 138 138 N
09/21/2018 18:00 09/20/2018 01:09:18 3 BOW_FMR1 SLKAWFS8 40 40 0 BOW BOW 69 138 N
09/21/2018 18:00 09/20/2018 01:09:18 4 3590__D DWLV89N8 474 474 0 SARRD OKLTP 138 138 N

Transmission Project and Information Tracking

Data

ERCOT Project Number Project Title (text, please start with location name first) Project Description (text) Comments/Reasons for Delays/Changes/Speedup (text) (Optional) Terminal "from" Location Terminal "to" Location Transmission Status "under construction planned or conceptual" Associated Projects (project number) (Optional) Transmission Owner (text) TSP/Company Contact Transmission Owner Project Number (Optional) Projected In-Service Date (Month/Yr) Actual In-Service Date (Month/Yr) Service Level kV Trans Circuit Miles New Trans Circuit Miles Rebuilt, Reconductored or Upgraded Autotransformer Capacity (MVA) Reactive Capability Added (Mvar, +Capacitor, -Reactor) County Location for Substation or Starting Point for a Line County Location for Ending Point for a Line (Optional for Substation projects) Planning Charter Tier Date Submitted TO ERCOT for RPG Review (Month/Yr) Date RPG Review Completed (Month/Yr) Date ERCOT BOD Review Completed (Month/Yr) SSWG Base Case Related Bus Numbers (If applicable) (CSV) Is the project reflected in SSWG Base Cases? (Y/N) Part of Interface (Y/N) Requested Additional Information (Optional) Other (Optional) Phase Number MOD Project Number
5188 Quaint Station: Build 69 kV station Construct new 69 kV ring bus on the Abilene Northwest to Anson 69 kV Line IN SERVICE Quaint In-Service 753 - 0936 AEP TNC "Jason Bryant mlforcum@aep.com 918-599-2674" 2623 Jun-18 69 0 0 0 Jones Tier 4 6237, 6388, 6236, 6238, 6243, 6249 Y N 5672 5188
7146 Howard Lane Tie Upgrade Upgrade the 138-kV Howard Lane tie line to bundle 2250 AAC. The planned tie line rating will be (MVA): Rate A=640, Rate B=710, Rate C=710. Howard Lane Howard Lane In-Service LCRATSC "Charles Dewitt_x000D_ Charles.Dewitt@LCRA.org_x000D_ 512-578-4199" Jun-18 138 0 0 0 Travis Travis Tier 4 7335, 9217 Y N 7810 7146

Reference

Forecast Zones

http://www.ercot.com/content/cdr/html/actual_loads_of_forecast_zones

  • NORTH
  • SOUTH
  • WEST
  • HOUSTON

Weather Zones

http://www.ercot.com/content/cdr/html/actual_loads_of_weather_zones

  • COAST (Coast)
  • EAST (East)
  • FAR_WEST (FarWest)
  • NORTH (North)
  • NORTH_C (NorthCentral)
  • SOUTHERN (Southern)
  • SOUTH_C (SouthCentral)
  • WEST (West)

Acronyms

  • GINR = Generation Interconnection or Change Request
  • COD= Commercial Operation Date
  • SS = Security Screening Study
  • FIS = Full Interconnection Study
  • IA = Interconnection Agreement; can be either of the following:
    • Standard Generation Interconnection Agreement (SGIA)
    • Public financially binding agreement
    • An official letter from a Municipally Owned Utility or Electric Cooperative signifying developer intent to build and operate generation facilities and interconnect with the MOU or EC
  • POI = Point of lnterconnection
  • INR = Interconnection Request Number
  • TSP = Transmission Service Provider
  • NtP = Notice-to-Proceed given to the TSP for interconnection construction
  • CDR = Capacity, Demand and Reserves Report
  • SFS = Sufficient Financial Security provided to the TSP for construction of the interconnection facilities
  • QSA = Quarterly Stability Assessment

Fuel Types

  • BIO = Biomass
  • COA = Coal
  • GAS = Gas
  • GEO = Geothermal
  • HYD = Hydrogen
  • NUC = Nuclear
  • OIL = Fuel Oil
  • OTH = Other
  • PET = Petcoke
  • SOL = Solar
  • WAT = Water
  • WIN = Wind

Technology Types

  • BA = Battery Energy Storage
  • CC = Combined-Cycle
  • CE = Compressed Air Energy Storage
  • CP = Concentrated Solar Power
  • EN = Energy Storage
  • FC = Fuel Cell
  • GT = Combustion (gas) Turbine, but not part of a Combined-Cycle
  • HY = Hydroelectric Turbine
  • IC = Internal Combustion Engine, eg. Reciprocating
  • OT = Other
  • PV = Photovoltaic Solar
  • ST = Steam Turbine other than Combined-Cycle
  • WT = Wind Turbine